New construction wiring for Boston area homes, from temporary power to final

A new house gets wired in stages that follow the builder's schedule. We set temporary power, rough in after framing, pre-wire network and low voltage, then trim out and pass final so the utility can connect.

Phones answered 24/7 for Boston, MA and nearby towns

  • Answered 24/7
  • Rough and final inspections booked
  • Low voltage pre-wire

Updated October 2026

Straight answer

New construction wiring in Boston and nearby towns runs in stages: temporary power for the builders, rough-in after framing with an inspection before insulation, then trim-out and a final inspection before the utility energizes the permanent service. Low voltage cabling for network, doorbells and cameras goes in at rough-in too, while the walls are still open.

How wiring follows a new build

On a new house the electrician shows up three or four times, each time at a specific point in the build. Temporary power comes first, so the framers can run saws. Rough-in follows framing and the plumbing and duct rough, because cable has to go around pipes and ducts, not the other way around. Trim-out waits for paint, and the final inspection comes last.

The planning happens before any of that. We go through the plans for service size, panel location, lighting layout, appliance circuits, heat pumps, EV charging and solar provisions. A new house built under the 2023 code carries more AFCI and GFCI protection than older ones, and getting the layout right on paper is much cheaper than moving boxes once the walls are framed.

Rough-in, temporary power and pre-wire

Rough-in and trim-out

Rough-in is when boxes are nailed to studs, cable is pulled and stapled, and the service entrance and panel are set. It happens after framing and after the plumber and HVAC contractor have run their lines, and it ends with a rough inspection that has to pass before insulation. Trim-out comes after drywall and paint: receptacles, switches, fixtures, the panel cover and breakers, then testing. The trade-off in scheduling is real. Rushing rough-in before the duct work is done leads to cable rerouted later, and trimming before the painters finish leaves overspray on devices that then get replaced.

Rough-in and trim-out by a WireUp electrician

Temporary power

Builders need power on day one, long before the house has walls. Temporary power is usually a pole or pedestal with a meter socket, a small panel and GFCI-protected receptacles for tools, set near the street and inspected before the utility connects it. It stays until the permanent service is energized. Where it sits matters: it has to be out of the way of excavation, deliveries and the foundation crew, and close enough that extension cords do not snake across the whole lot. When the build is done, we remove the temporary service and the utility pulls its meter.

Low voltage pre-wire

Network cable, coax, doorbell wiring, camera feeds and speaker wire all go in at the same rough-in stage, and they are cheap to run while studs are open and hard to add later. We run data cable from a central location, often the basement or a closet, to each room where you might want a wired connection, plus the TV walls and ceiling spots for wireless access points. Empty conduit to the attic and basement leaves a path for anything you think of later. The trade-off is cost now against convenience later, and most owners regret the runs they skipped, not the ones they added.

Starting a new build? Call to set temporary power and plan the wiring.

Call (617) 843-6591

What drives the cost of wiring a new house

New construction wiring is priced from the plans, and the estimate is broken into temporary power, rough-in and trim so it matches the build schedule.

  1. Square footage and room count. More rooms mean more circuits, boxes and cable.
  2. Service size. A 200 amp service costs less than a 400 amp service for an all-electric house.
  3. Lighting design. Many recessed lights, dimmers and scene controls add boxes and labor.
  4. Electrification loads. Heat pumps, induction cooking and EV charging drive the panel and feeder sizes.
  5. Low voltage scope. Each network, camera and speaker run is a separate cable.
  6. Site conditions. An underground service lateral and a long trench add work at the start.

What to pre-wire now and what can wait

What to run during rough-in and what can wait is one of the few wiring choices that gets harder later. This is how the common options compare.

Pre-wire options for a new house
Pre-wire itemIf run during rough-inIf added after drywall
Network cable to roomsShort runs in open studsFishing through finished walls and ceilings
EV charger circuit or conduitConduit to the garage, panel space savedSurface conduit or opened walls
Solar conduit to the atticEmpty conduit from panel to atticExterior conduit run on the siding
Camera and doorbell wiringBoxes at the eaves and doorBattery units or cut ceilings

Permits and utility rules from Boston to Danvers

New homes north of the city don't all connect to the grid the same way. Danvers runs its own town electric department instead of relying on an outside utility, and it puts its requirements for new and enlarged services in a written policy handbook. Before we set a meter socket or pick a service size on a Danvers build, we read that handbook and coordinate with the town's electric division, so the temporary service, the trench and the permanent hookup all line up with what it expects. That keeps the final connection from stalling while a finished house waits for power.

How long each wiring stage takes

Temporary power is usually a single visit plus the utility's connection time. Rough-in for a typical single-family house takes about one to two weeks of electrician time after framing, followed by the rough inspection. Trim-out takes several days once paint is done, and the final inspection and utility connection close it out. The builder's schedule sets the gaps between stages.

From plan review to an energized service

  1. Plan review

    We go through service size, panel location and the electrical layout with you and the builder.

  2. Temporary power

    A temporary service is set and inspected so the trades can work.

  3. Rough-in

    Service, panel, boxes, cable and low voltage go in after the plumbing and duct rough.

  4. Rough inspection

    The inspector sees the open walls before insulation goes in.

  5. Trim-out

    Devices, fixtures and breakers are installed after paint.

  6. Final and connect

    The final inspection passes and the utility energizes the permanent service.

New construction wiring questions

Day or night

Building a new home near Boston? Call to plan the wiring.

Tell us what is happening and where. We will ask a few questions, tell you what is safe to do until we arrive, and get an electrician scheduled.

Answered 24 hours a day(617) 843-6591WireUp Electrical Services

Reach us

Phone, hours and where we work

Phone
(617) 843-6591
Hours
Open 24 hours, 7 days a week
Office
Danvers, MA
Coverage
Serving Boston, MA and surrounding areas. See the Greater Boston coverage page

Boston and the towns around it, from Quincy up to the North Shore. The map loads only when you ask for it.

Call now, 24/7Electricians on call around Boston